Abstract:In order to obtain the maximum efficiency of defense engineering and improve the efficiency of national defense capital and making use of it, a gray incidence analysis combined with value Engineering is introduced into evaluating the value of defense engineering construct project according to the complexity of defense system. Through determining the weighting of factors, the best construction projects selecting can be realized, the cost is reduced, the technique innovation can be accelerated and, the military benefit and the economy benefit of defense engineering can be enhanced.